2022 Open House

Nothing like a end goal to get your layout cleaned up and working. We hosted the cub scouts and the Atlanta Garden Railroad Club GGRS this past weekend. It was a great day and a great turnout. All week long before the open house the weather was great with no rainfall. All the family came…

Water and Electricity Don’t Mix

When I started this train project I researched how to effectively wire the layout and I used standard LGB track.  I planned the layout, wired up the layout, and after everything was in place I found that the layout electrically is not reliable. Sometimes planning and research is not enough.  Experience is critical, as well…

Learning JMRI

Since all of my electronics were performing correctly it was now time to determine how to automate the processes.  I have selected JMRI which is a Java based open system that connects to model railroads.  As I have talked about previously I have standardized on Digitrax and I have connected my computer running JMRI to the…

Test the Electronics

I finally got the first phase of the track, signals, and turnouts wired up. I was able to test out each of the boards. I had trouble with the BDL186 showing the occupied blocks. After a lot of checking I noticed the green network light was not behaving as the other circuit boards did. This…