Water and Electricity Don’t Mix

When I started this train project I researched how to effectively wire the layout and I used standard LGB track.  I planned the layout, wired up the layout, and after everything was in place I found that the layout electrically is not reliable. Sometimes planning and research is not enough.  Experience is critical, as well…

Challenges of Electricty Outdoors

AS I built the track, it was raised on Hardiboard and had no dirt.  I ran the wires as needed to feed the power sectors of the track.  There are about 100 different sectors for the track layout and each of these had individual wires to feed the voltage to the track.  The wires feed…