Challenges of Electricty Outdoors

AS I built the track, it was raised on Hardiboard and had no dirt.  I ran the wires as needed to feed the power sectors of the track.  There are about 100 different sectors for the track layout and each of these had individual wires to feed the voltage to the track.  The wires feed…

Summer Vacations and A lot of Work Done

Brandon and Chele were home for a little over a week after the beach and we got a lot done on the train. We were able to wire up all the track electronics and the turnouts connecting them to the (8) DS64s abd (5) BDL168s which are Digitrax products.  Papa got to test the programs…

Test the Electronics

I finally got the first phase of the track, signals, and turnouts wired up. I was able to test out each of the boards. I had trouble with the BDL186 showing the occupied blocks. After a lot of checking I noticed the green network light was not behaving as the other circuit boards did. This…